How to use the gravel driveway calculator
- Enter the driveway as one or more sections (length × width), for example the straight run plus a wider apron or parking pad. Curved or odd areas can go in as extra square footage.
- Set up the layers from the bottom up. The defaults are a common three-layer build: coarse base stone, #57 stone, and a crusher-run top.
- For each layer, check the material, depth and weight per yard. Add the price per ton if you have a quote.
- Set the compaction allowance (15% is typical for crushed stone), your supplier's truck size and the delivery fee per load.
- For the installed cost, open Installation cost and add your quotes for fabric, labor (excavation, grading and compaction) and anything else. You get a total and a cost per square foot.
The formula
Area = length × width + extra area
Layer volume = area × layer depth (in) ÷ 12 × (1 + compaction %)
Layer tons = layer volume ÷ 27 × tons per cubic yard
Truckloads = Σ round up( layer tons ÷ truck capacity )
Fabric = area × 1.10 Gravel is delivered loose and then compacted, so a 4 in compacted layer needs more than 4 in of loose stone. The compaction allowance adds that back.
Each layer is usually a different product from the quarry, so trucks can't combine them. Loads are rounded up per layer, which matches how you will actually be billed.
Worked examples
New 60 × 12 ft driveway, three layers
- Area: 60 × 12 = 720 sq ft.
- Base: 4 in of #3 stone = 240 cu ft, + 15% = 276 cu ft = 10.2 cu yd × 1.4 = 14.3 tons.
- Middle: 4 in of #57 stone = also 14.3 tons.
- Top: 2 in of crusher run = 138 cu ft = 5.1 cu yd × 1.5 = 7.7 tons.
- Truckloads at 14 tons: 2 + 2 + 1 = 5 loads. Fabric: 792 sq ft.
About 36.3 tons of gravel in 5 deliveries.
Top-dressing an existing 100 × 10 ft driveway
- Area: 1,000 sq ft. One layer: 2 in of crusher run, + 15%.
- Volume: 191.7 cu ft = 7.1 cu yd × 1.5 = 10.6 tons.
One tandem load of about 11 tons.
A typical three-layer gravel driveway
| Layer | Material | Compacted depth | Purpose |
|---|---|---|---|
| Base | #3 or #4 stone (1.5–2.5 in) | 4–6 in | Spreads load over soft soil; drains |
| Middle | #57 stone (3/4 in) | 4 in | Locks into the base and fills voids |
| Top | Crusher run, #411 or 3/4 in minus | 2–4 in | Packs into a firm, smooth driving surface |
Stone numbers are AASHTO sizes used by most US quarries. Names vary by region, so describe the use to your supplier.
Assumptions and limits
- The driveway is treated as one rectangle plus any extra area you enter. For curves, use the average width.
- Compaction is a percentage added to every layer. Real compaction depends on the stone, moisture and the equipment used.
- Weights are typical. Your supplier's scale ticket decides what you pay for.
- Truck capacity is in tons. Local weight limits and road conditions can reduce a load.
Common mistakes to avoid
Putting only fine gravel on soft soil
Without a coarse base and fabric, small stone gets pushed into the mud and ruts within a season. The base layer is what carries the weight.
Forgetting the crown and drainage
A driveway needs a crown (higher in the middle) or a cross-slope, plus ditches or swales, so that water runs off. Standing water is what destroys gravel driveways.
Ordering by loose depth
If you order 4 in of loose stone and compact it, you end up with closer to 3.3 in. Keep the compaction allowance on.
Frequently asked questions
How many tons of gravel do I need for a driveway?
For each inch of depth, a 12 ft wide driveway needs about 0.05 tons per foot of length, before compaction. A 100 ft driveway built 8 in deep with 15% compaction needs about 48 tons.
How do I estimate gravel driveway installation cost?
Add the gravel for each layer (tons × your price per ton), delivery (loads × fee), geotextile fabric, and labor for excavation, grading and compaction, which is often quoted per square foot. The calculator totals these from your prices and shows the cost per square foot. We do not publish average prices, because gravel and labor prices vary widely by region and change often.
How deep should a gravel driveway be?
New driveways are usually 8–12 in deep in total, deeper on clay or wet soil. Top-dressing an existing, sound driveway needs only 2–3 in.
What is the best top layer for a gravel driveway?
Angular crushed stone with fines, such as crusher run, #411 or 3/4 in minus, packs into a firm surface. Round pea gravel rolls under tires and is a poor driving surface.
How much gravel does a dump truck carry?
Single-axle dump trucks carry about 6–8 tons, and tandem-axle trucks about 13–15 tons. Ask your supplier, and set the truck capacity to match.
Do I need landscape fabric under a gravel driveway?
On firm, well-drained soil it is optional. On clay, wet or soft soil, a woven geotextile under the base stops stone sinking and greatly extends the driveway's life.
Formulas covered by automated tests · Last reviewed · How we calculate